Building Permits, checklists and forms
Building Applications, checklists and forms
Building Applications, checklists and forms Permit Requirements Applications Building Permit Application (Electronic Submittal) Building Permit Application Form (In-person Submittals) Building Safety Complaint Form Building Code Board of Appeals Application Certificate of Occupancy Application Change of Occupancy - Certificate of Occupancy Electronic File Submittal Requirements for Building and Civil/Right-of-way Permit Applications Mechanical Plumbing Electrical MPE Permit Application (Electronic Submittals) Mechanical Plumbing Electrical MPE Permit Application (For In-person Submittals Only) Notification of Special Inspection By Owner Outdoor Lighting Compliance Worksheet - Multiple-family and Non-residential Land Uses Property Owner’s Authorization Form Permit Extension Application Permit Submittal for Manufactured Home Pool Spa Application (Electronic Submittals) Pool Spa Application (For In-person Submittals Only) Sign Permit Application Submit a Building Permit or Civil/Right-of-Way Encroachment Permits, click the link below: Click here to be sent to the Electronic Permit Application website Electronic File Submittal Requirements for Building and Civil & Right-of-Way Plan Review and Permit Applications Building, Civil/Right-of-Way Encroachment, and Sign Permit Timeframes: Application TypeAdministrative Review1, 2Substantive Review1, 2 Residential Permits (all types)35 Staff Review Days95 Staff Review Days Non-Residential and Subdivision Permits and maps (all types)45 Staff Review Days120 Staff Review Days Sign Permits 35 Staff Review Days 95 Staff Review Days Notes:1. Staff Review Days are the overall timeframe, in terms of working days, that the city will spend on an application before issuing a decision.2. Timeframes are suspended while any public utility, county, state, or federal approval processes related to an application are being completed Checklists and Forms Aviation Overlay Additional Building Permit Requirements Custom Home Guidance Fences and Walls Only Minimal Building Permit Checklist Inspection Request Manufactured Home Checklist Minimal Electrical Only Permit Checklist Minimal Mechanical Permit Only Checklist Minimal Plumbing Permit Only Checklist Notification of Special Inspection By Owner Residential Addition or Remodel Building Permit Checklist Residential Building Permit Submittal Requirements Checklist Residential Standard Plan Building Application Checklist Residential Solar System Permit Checklist Truss Design Drawings: One- and Two-Family Residential Delayed Submittal Request Dedication Forms Aviation Overlay - Residential Development in the AO-2 Area: Avigation Easement, Covenant and Waiver Agreement Dedication Aviation Overlay - All Other Development: Avigation Easement, Covenant and Waiver Dedication Lien Holder Confirmation of Dedication Handouts Blue Stake en Español Blue Stake State Retention Schedule Inspection Request Exempt from permits Current Codes Current Adopted Codes 2018 International Building Code 2018 International Residential Code 2018 International Mechanical Code 2018 International Plumbing Code. 2017 National Electrical Code 2018 International Fuel Gas Code 2018 International Fire Code 2018 International Property Maintenance Code 2018 Energy Code City Code and Amendments to the Adopted Codes Building Loads Ground Snow Load: 0 Wind Speed: 115 miles per hour (applicable to development regulated by the 2018 IRC and when specified in the 2018 IBC amendments) Seismic Design Category: B Frost Line Depth: 0 Termite: Heavy Winter Design Temperature: 34 Flood Hazards: Pinal County Flood Control District Air Freezing Index: 50 Mean Annual Temperature: 68 Minimum Footing Depth: 12"
