Skip to main content
Day.News — Local News. Real Community.
TEQUESTA DAY NEWS
Local News. Real Community.
Tequesta Drive Bridge Restoration Project Underway
local_news
1 min read

Tequesta Drive Bridge Restoration Project Underway, Expected Completion December 2026

The Tequesta Drive Bridge Restoration Project, which began in July 2026, continues to progress with an expected completion by December 2026. This vital infrastructure project aims to improve the bridge's structure and extend its service life.

09/22/2026 · Tequesta edition

Advertisement

Advertisement

The Tequesta Drive Bridge Restoration Project, which began in July 2026, continues to progress with an expected completion by December 2026. This vital infrastructure project aims to improve the bridge's structure, extend its service life, and secure this important transportation route for years to come.

The restoration work includes concrete repairs to the bridge deck and approach slabs, along with repairs to bridge rails, sidewalks, and other structural components. The final phase of the project will involve pressure cleaning and painting the bridge exterior.

The bridge will remain open throughout the construction period. However, residents should anticipate temporary single-lane closures and traffic shifts as needed to safely complete the work. Flaggers and traffic control devices will be in place during these times. Motorists should allow extra travel time and use caution when traveling through the work zone.

A protected bat colony resides beneath the center portion of the bridge. State regulations protect these bats. The Village is not disturbing, removing, or dispersing the bat colony. Construction activities are taking place primarily on top of the bridge and at the bridge approaches to avoid impacting the colony.

Pedestrians and boaters should exercise caution around the work area and adhere to all posted signs. The Public Works Department can address inquiries at 561-768-0482.

Related Topics

Editorial Transparency
AI-Generated · Written by Olivia Grant

Article Ratings

Factual
0.0
Likeable
0.0
Bias
0.0
Objective
0.0

How do you feel about this story?

OL

Olivia Grant

Trust 3.8191 articles0 views94% fact accuracy
View Profile

Sign in to follow this author from their profile.

Discussion (0)

Join the Conversation

Join the conversation

Sign in to share your thoughts, reply to readers, and like comments.

Sign in to comment
Sort by:
0 comments

No comments yet. Be the first to comment!

Trending Now

Trending stories will appear here.

More from Tequesta

No other local stories are available right now.

Events & Things to Do

Read section →

Upcoming events will appear here.

Advertisement

Advertisement

Keep Reading

Related Stories

More local news stories from Tequesta

local news

New permit exemptions for residential work in Tequesta: What homeowners need to know

Tequesta homeowners now have new guidelines for residential projects, with two limited building permit exemptions introduced by Florida House Bill 803 (2026).

Read Story →
local news

Tequesta clarifies artificial turf rules for homeowners and businesses

Tequesta residents must obtain a building permit for artificial turf installations, following regulations adopted in December 2023 that specify placement, quality, and maintenance.

Read Story →
local news

Palm Beach County Shifts Impact Fee Calculation Method

Palm Beach County shifted its impact fee calculation method on January 1, 2026, now basing assessments on the issuance date rather than the application date, affecting all fee components.

Read Story →
local news

Tequesta Residents Must Follow Tree Removal Guidelines

Tequesta residents must follow specific procedures for tree removal or replacement, including submitting a written application to the Building Department.

Read Story →
local news

Tequesta clarifies private provider program for building reviews and inspections

Tequesta clarifies the Private Provider Program, allowing licensed professionals to conduct building plan reviews and inspections for specific disciplines, while the Village maintains oversight.

Read Story →
local news

Tequesta To Publish Annual Building Permit Utilization Report By Year-End

Tequesta will publish its annual Building Permit and Inspection Utilization Report by December 31, detailing how the village used permit fees during the 2025 fiscal year.

Read Story →
Scroll for more stories