Skip to main content
Day.News — Local News. Real Community.
247 neighbors reading now

Grove City Day News

Maitland: History, Arts, and Lakeside Living.Grove City, OH Edition
other
5 min read

Maitland Sandspur Road Closure & Rebuild | Late June

Staff Writer
May 25, 2026
Maitland to Rebuild Sandspur Road Starting Late June

Maitland will close Sandspur Road from west of Bucher Road to Hope Road for up to five weeks beginning in late June. The Public Works Department will rebuild the roadway and south sidewalk, addressing damage from vehicle traffic, weather, and tree roots that have lifted asphalt, concrete curbs, and pavement.

Single-lane closures will also occur on Sandspur Road west toward Wymore Road. Traffic will detour north to Maitland Boulevard or south to East Kennedy Boulevard and Lake Avenue. Residents on the south side of the closure will access their neighborhood via North Lake Sybelia Drive.

Before construction begins, the city will remove trees from public right-of-way areas where roots have created safety hazards for pedestrians, cyclists, and scooter riders. The trees were planted in spaces too confined for their mature sizes, or are aged or diseased. After road work concludes, smaller tree varieties will be replanted. Most existing trees along the corridor will remain.

The Public Works Department scheduled the project for summer to minimize disruption to Lake Sybelia Elementary School and Orangewood Christian School. The department will coordinate with Lake Sybelia Elementary to maintain access for a family summer program. Work should conclude by August, before the school year begins.

Related Topics

Editorial Transparency
Original Reporting

Article Ratings

Factual
0.0
Likeable
0.0
Bias
0.0
Objective
0.0

0 ratings submitted

How do you feel about this story?

Discussion (0)

Join the Conversation

U

Be respectful and thoughtful in your comments.

Sort by:
0 comments

No comments yet. Be the first to comment!

Trending Now

Upcoming Events

Advertisement
Sponsor Message