Skip to main content
Day.News — Local News. Real Community.
FLORIDA DAY NEWS
Local News. Real Community.
Panama City moves forward with Cedar Grove wastewater system upgrade
local_news
1 min read

Panama City Advances Cedar Grove Wastewater System Upgrade with Federal Grant Funding

Panama City is advancing plans to upgrade the wastewater collection system in its Cedar Grove Subdistrict to enhance resilience and capacity. The project is funded through the Hazard Mitigation Grant Program (HMGP) DR-4399-111-R.

10/02/2026 · Florida edition

Advertisement

Advertisement

Panama City is advancing plans to upgrade the wastewater collection system in its Cedar Grove Subdistrict, a project aimed at enhancing resilience and capacity. The initiative, funded through the Hazard Mitigation Grant Program (HMGP) DR-4399-111-R, focuses on protecting critical infrastructure within the 32405 zip code area.

The initial phase, known as Phase I, involved surveying, engineering, design, plans preparation, permitting, and bidding. This crucial groundwork laid the foundation for future improvements, though no construction activities have yet received approval. The project's primary goal is to provide protective measures for the wastewater system, particularly in an area identified by coordinates (30.176714, -85.627544).

Phase II outlines significant infrastructure enhancements, including the construction of an adjunct sewage lift station and force main. This new infrastructure will reduce the flow demand on the existing BC-29 lift station and increase the overall capacity of the system. The new lift station will be located at the Southeast corner of Spring Avenue Park and will feature a wet well, valve box, two electric submersible pumps, associated piping, a control panel, and electrical connections.

A key component of the new lift station is a permanent diesel-powered bypass pump, designed to ensure continuous operation during power outages. This bypass pump will have a capacity of 400 to 500 gallons per minute (GPM). The installation also includes a platform to raise the bypass pump and electrical equipment, providing enhanced protection against potential hazards. The city will provide deliverables for Phase II review once the initial planning stages are complete.

Related Topics

Editorial Transparency
AI-Generated · Written by Claire Donovan

Article Ratings

Factual
0.0
Likeable
0.0
Bias
0.0
Objective
0.0

How do you feel about this story?

CL

Claire Donovan

Trust 3.6178 articles0 views94% fact accuracy
View Profile

Sign in to follow this author from their profile.

Discussion (0)

Join the Conversation

Join the conversation

Sign in to share your thoughts, reply to readers, and like comments.

Sign in to comment
Sort by:
0 comments

No comments yet. Be the first to comment!

Trending Now

Trending stories will appear here.

More from Florida

No other local stories are available right now.

Events & Things to Do

Read section →

Upcoming events will appear here.

Advertisement

Advertisement

Keep Reading

Related Stories

More local news stories from Florida

local news

Palm Coast utility rates for water, sewer, and trash will rise Oct. 1

Palm Coast residents will see utility rate increases for water, wastewater, stormwater, and solid waste services starting October 1st.

Read Story →
local news

Rockledge Division Keeps City Running: Roads, Drainage, and Buildings Maintained

Rockledge's Construction/Building Maintenance Division maintains city streets, drainage, sidewalks, and buildings, while also undertaking key infrastructure projects like new pathways and road resurfacing.

Read Story →
local news

Hallandale Beach details five-year capital improvement plan for future development

Hallandale Beach has detailed its five-year Capital Improvement Plan, outlining future development projects and infrastructure investments for the community.

Read Story →
local news

Sumter County FY 2026-2027 budget process nears completion

Sumter County residents have a final chance to comment on the FY 2026-2027 budget before its adoption on September 29, 2026.

Read Story →
local news

Panama City Beach Advances With Hurricane-Resistant Safe Room at Western Resiliency Center

Panama City Beach has advanced with plans for a new hurricane-resistant safe room at the Western Resiliency Center, designed to FEMA P-361 standards.

Read Story →
local news

Safety Harbor Finance Advisory Committee Seeks New Member

Safety Harbor's Finance Advisory Committee meets monthly to discuss city finances and currently has a vacant position for interested residents.

Read Story →
Scroll for more stories