Columnists
09/29/2026 · Skowhegan
Lanesboro, Minnesota: The Bike Trail Town That Forgot to Be Boring
Follow the Root River into southeastern Minnesota for limestone bluffs, a walkable main street, and a breakfast plate that justifies the entire drive. Lanesboro is small enough to understand in one afternoon and strange enough to keep you poking around until dinner.
The Farmer’s Carry: The Simple Exercise That Makes Everything Feel Sturdier
Pick up two moderately heavy objects and walk with them. The farmer’s carry trains your grip, trunk, shoulders, and walking mechanics at the same time—without requiring a machine that looks like it belongs in a spaceship.
09/30/2026
The Cast-Iron Cornbread That Actually Has a Crust
Cornbread should be tender in the middle and audibly crisp around the edges. The trick is simple: heat the skillet before the batter ever gets near it.
09/30/2026
Cut Your First Hand-Cut Dovetail Box With a $15 Saw
A small dovetail box is the woodworking equivalent of learning to shuffle a deck: awkward at first, satisfying forever. Here’s a forgiving weekend method using inexpensive tools and one rule that keeps the joints tight.
09/30/2026
Ocean Path: Acadia’s Easiest Walk With the Best Sea Drama
Along Acadia’s Ocean Path, you get crashing surf, pink granite, and a perfectly reasonable chance of seeing a seal without committing to a heroic hike. Start early, bring a jacket, and let the ocean do the entertaining.
09/30/2026
The Slow Jerkbait Bite Is Waking Up
Early spring bass are not lazy—they’re cold, suspicious, and standing where the sun can reach them. Fish a jerkbait like you’re trying to annoy a sleeping dog, and the first solid thump may come from the biggest fish of the day.
09/30/2026
Advertisement
Upcoming Events
View allOCT
02
Give Thanks and Goodbye Bears
12:00 AM - Free
OCT
02
Natalie MacMaster w/ Donnell Leahy
7:30 PM
OCT
03
Sacred Heart at Maine
19:30
Announcements
View allRoute 113 Daytime Closures
Route 113 Daytime Closures 8/29/2025 MAINE/NEW HAMPSHIRE - From September 8 to November 14, the Maine Department of Transportation will close Route 113 through the White Mountain National Forest to all vehicles from 7 A.M. to 5 P.M. on weekdays for a cable guardrail replacement project. The project area begins just south of the Spruce Hill Trail parking area and extends south to the Brickett Place. This project is expected to be completed by this fall. Bicyclists and pedestrians may continue to use the entirety of Route 113. Bikers and pedestrians will need to use caution when approaching a work zone and follow the flagger’s instructions. Onsite signage will be updated regularly to show which sections of Route 113 are closed to vehicles. All through traffic intending to use Route 113 should seek an alternate route between the hours of 7 A.M. to 5 P.M. Maine drivers should use Route 5 and New Hampshire drivers should use Routes 16 and 302 as an alternative route. The contractor on this project is CA Newcomb & Sons of Carmel, Maine. The contract amount is $1,412,910.00. MaineDOT will provide updates on the project as needed via our website.
Spurwink Bridge Work in Cape Elizabeth
Spurwink Bridge Work in Cape Elizabeth 8/29/2025 CAPE ELIZABETH - The Maine Department of Transportation will begin work on the Spurwink Bridge for a bridge wearing surface replacement project starting on September 2. Work is expected to be completed by the end of October 2025. The bridge and adjacent approach roadway will be reduced to one 12’ wide lane. Drivers should expect one-way alternating traffic that will be controlled with temporary traffic signals. The contractor on this project is Wyman & Simpson of Richmond, Maine. The contract amount for this project is $320,000.
Mitchell Bridge Closure in Scarborough
Mitchell Bridge Closure in Scarborough | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Mitchell Bridge Closure in Scarborough 8/26/2025 SCARBOROUGH – The Maine Department of Transportation will be closing the Mitchell Bridge on Mitchell Hill Road at the town line between Gorham & Scarborough on September 2 for up to 45 days for a culvert replacement project. There will be signage along the detour route. The detour uses Holmes Road, Beech Ridge Road, County Road/Route 22, and Burnham Rd. The anticipated completion date for this project is October 24. The contractor on this project is T. Buck Construction, Inc. of Turner, Maine. The contract amount is $940,000.
Advertisement
Advertisement
