Oviedo Stormwater Pipe Replacement on Mactavandash Lane
Oviedo has begun a stormwater pipe replacement project at Mactavandash Lane and Maclauren Court, expected to improve drainage and reduce flooding. Motorists should expect a lane shift and exercise caution in the work zone.
Advertisement
A stormwater pipe replacement project began Monday, Aug. 7, 2026, at the intersection of Mactavandash Lane and Maclauren Court in Oviedo. A local firm, contracted by the City of Oviedo, will complete the work, which is expected to last through mid-October.
The project aims to enhance the town's stormwater management system, improving drainage and reducing the risk of localized flooding in nearby neighborhoods.
A lane shift is in effect on Mactavandash Lane from Macglenross Drive to Abbotsford Court to accommodate construction. Motorists should drive with caution through the work zone and follow all posted traffic control devices and signage to ensure the safety of construction crews and the public.



Discussion (0)
Join the Conversation
Join the conversation
Sign in to share your thoughts, reply to readers, and like comments.
No comments yet. Be the first to comment!