Community Sports
10/01/2026 · Piscataquis County
Embiid's Injury History Poses Trade Challenge for 76ers Management
New 76ers management faces a complex situation with Joel Embiid's trade potential. The center's career-long injury history complicates any prospective deal. His inability to play more than 68 games in a single season raises concerns for interested teams.
Cavaliers Secure 3-2 Series Lead Over Pistons in Overtime Victory
The Cleveland Cavaliers defeated the Detroit Pistons 117-113 in overtime, taking a 3-2 series lead in the Eastern Conference Semifinals. Cade Cunningham led the Pistons with 39 points, but Detroit lost a nine-point lead in the final minutes of regulation.
10/01/2026
Cavaliers Secure Overtime Victory Over Pistons in Game 5, Take Series Lead
The Cleveland Cavaliers defeated the Detroit Pistons 117-113 in overtime during Game 5. Cleveland now leads the NBA playoff series 3-2. The game concluded regulation with a play involving Jarrett Allen and Ausar Thompson.
10/01/2026
Cavaliers Win Overtime Thriller, Take 3-2 Series Lead
The Cleveland Cavaliers defeated the Detroit Pistons 117-113 in overtime, securing a 3-2 series lead in the Eastern Conference semifinals. James Harden led the Cavaliers with 30 points, while Cade Cunningham scored 39 for the Pistons.
10/01/2026
Cavaliers Secure Game 5 Victory Over Pistons
The Cleveland Cavaliers defeated the Detroit Pistons 102-88 in Game 5, advancing in the NBA Playoffs. Donovan Mitchell led the Cavaliers with 30 points, securing their series victory. Cade Cunningham posted 25 points for the Pistons in the losing effort.
10/01/2026
Cities Consider Air Conditioning Access Amid Rising Temperatures
Cities across the United States are exploring policies that could classify air conditioning as a fundamental right for residents. These considerations follow a summer marked by significant heat, prompting a reevaluation of climate adaptation strategies. The ongoing debate forms part of a broader series examining 'Tipping Point' issues related to environmental changes.
09/28/2026
Advertisement
Upcoming Events
View allOCT
03
Sacred Heart at Maine
19:30
Announcements
View allMaxwell Bridge Project Detour in Litchfield
Maxwell Bridge Project Detour in Litchfield | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Maxwell Bridge Project Detour in Litchfield 10/08/2025 LITCHFIELD – The Maine Department of Transportation will be performing work on the Maxwell Bridge over Maggoty Meadow Brook for up to thirty days to replace the precast concrete box culvert starting on October 8. The work is expected to be completed by November 4. Richmond Road (Route 197) will be open to local traffic. Upper Pond Road will be closed to through traffic. Message boards will be used to alert drivers of the detour and closure. Drivers should follow posted detour signs. The contractor on this project is Shaw Brothers Construction, Inc. of Gorham, Maine. The contract amount is $826,611.
Overnight Ramp Closures in Brunswick
Overnight Ramp Closures in Brunswick | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Overnight Ramp Closures in Brunswick 10/08/2025 BRUNSWICK – The Maine Department of Transportation will be closing three ramps in Brunswick overnight on October 8, 2025, from 9:00 PM to 6:00 AM. The southbound off ramp to Cooks Corner, the southbound off ramp to Route 196 West, and the northbound on ramp to Route 1 North from Cooks Corner will be closed for maintenance. Closures will be clearly marked with signs and cones. The closure will last for one night. Drivers traveling southbound on Route 1 from Bath to Cooks Corner will use the New Meadow Road Exit and connect to Bath Road to reach Cooks Corner or remain on Route 1 and exit on Ramp B (Main Street) and use Main Street to Mason St, to the Route 1 North on ramp and use the Cooks Corner exit. Drivers traveling southbound to Route 196 West will continue South on Route 1 to Ramp B (Main St). From there, drivers should take Maine Street to Mason St, To the Route 1 North on ramp and use Ramp C to Route 196 West. Drivers traveling from Cooks Corner to Route 1 North should use Bath Road to New Meadows Road to Route 1 North. These closures are part of an ongoing highway rehabilitation project. The project covers an area that begins 0.17 miles east of Cushing Street and extends east for 3.02 miles, as well as 0.70 miles west of Old Bath Road and extending west for 3.39 miles. All local approaches and ramps are included in this work, which consists of pavement milling, hot mix asphalt overlay, and safety improvements. The contractor on this project is Coastal Road Repair of Westbrook, Maine. The contract amount is $15,544,396.25.
Nightwork on I-295 over Route 1
Nightwork on I-295 over Route 1 | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Nightwork on I-295 over Route 1 10/08/2025 YARMOUTH – The Maine Department of Transportation will be reducing both northbound and southbound traffic on I-295 to a single lane between 8:00 PM and 6:00 AM, beginning Sunday, October 12, at 8:00 PM. The lane reduction is necessary to install rumble strips along the highway. The nightwork may be conducted a second evening if necessary. MaineDOT will provide updates on the project as needed. The contractor on this project is CPM Constructors. The contract amount is $27,566,209.72.
Advertisement
Advertisement
