South Verdi Road Safety Project Planned for 2026–2028
The South Verdi Road Safety Project limits are from Cabela Drive to Bridge Street. The proposed improvements include striping, signage, & enhancing driver visibility.
The South Verdi Road Safety Project limits are from Cabela Drive to Bridge Street. The proposed improvements include striping, signage, & enhancing driver visibility. Design: Summer 2026 – Winter 2027 Construction: Spring 2028 Total Project Estimate: $2,600,000 Funding Source: RTC Fuel Tax To bid, click here: https://rtcwashoe.procureware.com/login Stay connected with RTC. Sign up for our newsletter and service notifications to get the latest updates, alerts, and transit news. RTC Washoe 1105 Terminal Way Reno, NV 89502
