Hearings Set for Proposed Industrial Development on Mount Pleasant Rd

Proposal to subdivide a 106.5-acre tract located at 2843 Mount Pleasant Road into three lots for industrial use. Lot 1 will contain a 603,200-sf industrial building; Lot 2 will contain an industrial park consisting of two buildings of 378,000 and 246,580 sf. No improvements are proposed for Lot 3.
Proposal to subdivide a 106.5-acre tract located at 2843 Mount Pleasant Road into three lots for industrial use. Lot 1 will contain a 603,200-sf industrial building; Lot 2 will contain an industrial park consisting of two buildings of 378,000 and 246,580 sf. No improvements are proposed for Lot 3. First hearing date: April 14, 2026; 6:00 p.m. at the Gibble Auditorium of the Masters Center for Science, Mathematics and Engineering on the Elizabethtown College Campus (1 Alpha Drive, Elizabethtown) Second hearing date: April 30, 2026; 6:00 p.m. at the Gibble Auditorium of the Masters Center for Science, Mathematics and Engineering on the Elizabethtown College Campus (1 Alpha Drive, Elizabethtown) link to Elizabethtown College interactive map IMPORTANT! E-town College Bag Check Policy Additional dates available for continuances: April 30, 2026 & TBD Legal Notice / Scheduling Letter Zoning Hearing application filed 11/13/2025 requests the following approvals under the Mount Joy Township Zoning Ordinance: Special exception pursuant to Sections 135-163.B & 135-163.C for industrial uses exceeding 50,000 sf Special exception pursuant to Section 135-163.E for an industrial park Extension of time pursuant to Section 135-383.B(7) to pull a zoning permit and complete construction 11/13/2025 submission files: Application w/ Supplement Exhibits: subject property deed LanCo view parcel map site plan: site plan / grading & drainage / utilities & easements / truck turning landscaping plan lighting plan waters delineation report transportation impact study renderings environmental technical memorandum performance standards for non-residential land uses sound level study offsite improvements plan sewer capacity certification adjoining property owners Transportation Impact Study Technical Appendices: existing roadway conditions traffic count data nearby development information trip generation and distribution volume development sheets synchro capacity/queue analysis auxiliary turn lane warrant analysis traffic signal permit plans concept plans & estimates — SKIPPED — road segment analysis part 1 / part 2 Township Engineer review of plan Traffic Study review
