Skip to main content
Day.News — Local News. Real Community.
LEWISTON DAY NEWS
Local News. Real Community.

Daily Fun

10/05/2026 · Lewiston

Full Edition

The Tiny Pause That Keeps You From Overcommitting

You don’t have to answer every request on the spot. Try this small boundary today: give yourself time to decide before your reflexive yes takes over.

10/05/2026
Read Story
Poem of the Day

The Two-Word Spell That Makes Blake’s Tiger Still Roar

William Blake’s “The Tyger” is famous for its questions, but its real magic may live in two unsettling words: “fearful symmetry.” Here’s how that tiny contradiction can sharpen your own writing today.

10/05/2026

Quote of the Day

The Most Radical Gift You Can Give Is Your Full Attention

Simone Weil thought attention was more than concentration: it was an ethical act, a way of treating another person’s existence as worthy of your time. That idea becomes startlingly practical when your phone is quietly begging to be worshipped.

10/05/2026

The National Ear

The Tariff Hangover Arrives Before the Bill

Washington keeps selling tariffs as leverage, while families and small manufacturers prepare for higher prices and thinner margins. Congress also finds new ways to confuse motion with progress.

10/05/2026

The Curator

Please Stop Turning Paintings Into Theme-Park Rides

The immersive art exhibit has officially reached the stage where the artwork is the least important thing in the room. I’m begging museums, producers, and giant projectors to let paintings be weird, quiet, and occasionally difficult again.

10/05/2026

Good Karma Corner

The Boring Fixes Are Winning

Ozone recovery, cloned ferrets, and free school meals give us three solid reasons to respect patient work. Good news rarely arrives with fireworks. It arrives with paperwork, freezer samples, and someone remembering to pack extra sandwiches.

10/05/2026

Advertisement

Advertisement

Announcements

View all
!

Maxwell Bridge Project Detour in Litchfield

Maxwell Bridge Project Detour in Litchfield | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Maxwell Bridge Project Detour in Litchfield 10/08/2025 LITCHFIELD – The Maine Department of Transportation will be performing work on the Maxwell Bridge over Maggoty Meadow Brook for up to thirty days to replace the precast concrete box culvert starting on October 8. The work is expected to be completed by November 4. Richmond Road (Route 197) will be open to local traffic. Upper Pond Road will be closed to through traffic. Message boards will be used to alert drivers of the detour and closure. Drivers should follow posted detour signs. The contractor on this project is Shaw Brothers Construction, Inc. of Gorham, Maine. The contract amount is $826,611.

!

Overnight Ramp Closures in Brunswick

Overnight Ramp Closures in Brunswick | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Overnight Ramp Closures in Brunswick 10/08/2025 BRUNSWICK – The Maine Department of Transportation will be closing three ramps in Brunswick overnight on October 8, 2025, from 9:00 PM to 6:00 AM. The southbound off ramp to Cooks Corner, the southbound off ramp to Route 196 West, and the northbound on ramp to Route 1 North from Cooks Corner will be closed for maintenance. Closures will be clearly marked with signs and cones. The closure will last for one night. Drivers traveling southbound on Route 1 from Bath to Cooks Corner will use the New Meadow Road Exit and connect to Bath Road to reach Cooks Corner or remain on Route 1 and exit on Ramp B (Main Street) and use Main Street to Mason St, to the Route 1 North on ramp and use the Cooks Corner exit. Drivers traveling southbound to Route 196 West will continue South on Route 1 to Ramp B (Main St). From there, drivers should take Maine Street to Mason St, To the Route 1 North on ramp and use Ramp C to Route 196 West. Drivers traveling from Cooks Corner to Route 1 North should use Bath Road to New Meadows Road to Route 1 North. These closures are part of an ongoing highway rehabilitation project. The project covers an area that begins 0.17 miles east of Cushing Street and extends east for 3.02 miles, as well as 0.70 miles west of Old Bath Road and extending west for 3.39 miles. All local approaches and ramps are included in this work, which consists of pavement milling, hot mix asphalt overlay, and safety improvements. The contractor on this project is Coastal Road Repair of Westbrook, Maine. The contract amount is $15,544,396.25.

!

Nightwork on I-295 over Route 1

Nightwork on I-295 over Route 1 | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Nightwork on I-295 over Route 1 10/08/2025 YARMOUTH – The Maine Department of Transportation will be reducing both northbound and southbound traffic on I-295 to a single lane between 8:00 PM and 6:00 AM, beginning Sunday, October 12, at 8:00 PM. The lane reduction is necessary to install rumble strips along the highway. The nightwork may be conducted a second evening if necessary. MaineDOT will provide updates on the project as needed. The contractor on this project is CPM Constructors. The contract amount is $27,566,209.72.

Advertisement

Advertisement

Advertisement

Advertisement