Daily Fun
10/03/2026 · Lewiston
The Tiny “If–Then” Plan That Keeps Your Day From Hijacking You
You do not need a perfect schedule to stay grounded. One sentence made before the chaos starts can make your next good choice much easier.
The Compliment That Outwits Time
Shakespeare’s famous sonnet is not merely saying, “You’re beautiful.” It makes a daring promise: beauty can fade, but a poem can keep someone vividly alive.
10/03/2026
Hannah Arendt on the One Thing No Undo Button Can Fix
We often treat forgiveness as moral sugar coating. Hannah Arendt had a sharper idea: it is the political technology that keeps one irreversible mistake from becoming the rest of your life.
10/03/2026
The Price Tag Keeps Moving, and Washington Keeps Pretending It Has a Plan
Tariffs, immigration fights, artificial intelligence, and a budget deadline now collide in one national argument about who pays and who gets protected. The fine print matters more than the shouting, especially when the fine print lands on your grocery receipt.
10/03/2026
The Tiny Lies That Turn Into a Very Large Relationship
Three readers ask about family group chats, hidden spending, and the ex who keeps “accidentally” showing up. The common thread: trust rarely collapses in one dramatic scene; it leaks out through the little things people hope won’t count.
10/03/2026
Hollywood’s Funniest Show Is Also Hollywood’s Meanest Mirror
<em>The Studio</em> understands that show business is a machine powered by panic, ego, and people saying “content” with a straight face. Here’s what else deserves your evening — and what should be quietly escorted out of it.
10/03/2026
Advertisement
Upcoming Events
View allOCT
03
Sacred Heart at Maine
19:30
Announcements
View allMaxwell Bridge Project Detour in Litchfield
Maxwell Bridge Project Detour in Litchfield | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Maxwell Bridge Project Detour in Litchfield 10/08/2025 LITCHFIELD – The Maine Department of Transportation will be performing work on the Maxwell Bridge over Maggoty Meadow Brook for up to thirty days to replace the precast concrete box culvert starting on October 8. The work is expected to be completed by November 4. Richmond Road (Route 197) will be open to local traffic. Upper Pond Road will be closed to through traffic. Message boards will be used to alert drivers of the detour and closure. Drivers should follow posted detour signs. The contractor on this project is Shaw Brothers Construction, Inc. of Gorham, Maine. The contract amount is $826,611.
Overnight Ramp Closures in Brunswick
Overnight Ramp Closures in Brunswick | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Overnight Ramp Closures in Brunswick 10/08/2025 BRUNSWICK – The Maine Department of Transportation will be closing three ramps in Brunswick overnight on October 8, 2025, from 9:00 PM to 6:00 AM. The southbound off ramp to Cooks Corner, the southbound off ramp to Route 196 West, and the northbound on ramp to Route 1 North from Cooks Corner will be closed for maintenance. Closures will be clearly marked with signs and cones. The closure will last for one night. Drivers traveling southbound on Route 1 from Bath to Cooks Corner will use the New Meadow Road Exit and connect to Bath Road to reach Cooks Corner or remain on Route 1 and exit on Ramp B (Main Street) and use Main Street to Mason St, to the Route 1 North on ramp and use the Cooks Corner exit. Drivers traveling southbound to Route 196 West will continue South on Route 1 to Ramp B (Main St). From there, drivers should take Maine Street to Mason St, To the Route 1 North on ramp and use Ramp C to Route 196 West. Drivers traveling from Cooks Corner to Route 1 North should use Bath Road to New Meadows Road to Route 1 North. These closures are part of an ongoing highway rehabilitation project. The project covers an area that begins 0.17 miles east of Cushing Street and extends east for 3.02 miles, as well as 0.70 miles west of Old Bath Road and extending west for 3.39 miles. All local approaches and ramps are included in this work, which consists of pavement milling, hot mix asphalt overlay, and safety improvements. The contractor on this project is Coastal Road Repair of Westbrook, Maine. The contract amount is $15,544,396.25.
Nightwork on I-295 over Route 1
Nightwork on I-295 over Route 1 | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Nightwork on I-295 over Route 1 10/08/2025 YARMOUTH – The Maine Department of Transportation will be reducing both northbound and southbound traffic on I-295 to a single lane between 8:00 PM and 6:00 AM, beginning Sunday, October 12, at 8:00 PM. The lane reduction is necessary to install rumble strips along the highway. The nightwork may be conducted a second evening if necessary. MaineDOT will provide updates on the project as needed. The contractor on this project is CPM Constructors. The contract amount is $27,566,209.72.
Advertisement
Advertisement
