Skip to main content
Day.News — Local News. Real Community.
LEWISTON DAY NEWS
Local News. Real Community.

National

07/21/2026 · Lewiston

Full Edition

Review Led by Sir Stephen Timms Examines Disability Benefits System

Sir Stephen Timms, a Member of Parliament and lead of a benefit review, stated that the Personal Independence Payment (PIP) system for England and Wales requires changes. This review focuses on the current structure and delivery of disability benefits. Timms' comments indicate an ongoing evaluation of their suitability.

07/21/2026
Read Story
Politics

Donald Trump Discloses $1.2 Billion From Crypto Ventures in Federal Filing

A recent federal financial disclosure revealed that former President Donald Trump received approximately $1.2 billion from cryptocurrency-related businesses last year. The filing provides insight into earnings from these ventures.

07/21/2026

Crime

ICE Agent Kills Man During Arrest Attempt in Houston

A U.S. Immigration and Customs Enforcement (ICE) agent shot and killed Lorenzo Salgado Araujo in Houston during an arrest attempt. Federal authorities stated Araujo attempted to flee and "weaponized his vehicle." Family members and local officials have called for an investigation.

07/21/2026

Local News

President Trump Comments on U.S. Response to Iran

President Donald Trump stated on Sunday that continued reciprocal strikes with Iran could force the United States to return to war. These remarks cap a weekend of escalating tensions threatening peace efforts between the countries.

07/21/2026

Local News

Khamenei's Sons Attend Funeral Amidst Speculation on Succession

Ayatollah Ali Khamenei's sons appeared at his funeral in Iran. Their presence occurs amid ongoing discussions regarding the choice of the next supreme leader. Iran has previously asserted its control over the Strait of Hormuz.

07/21/2026

Sports

Health Officials Issue Week-Long Heat Alert as Temperatures Approach 34C

A new heatwave is anticipated to bring temperatures reaching up to 34 degrees Celsius. Health officials have issued a week-long alert, advising the public on potential health risks associated with the extended period of high heat.

07/21/2026

Advertisement

Advertisement

Upcoming Events

View all

SEP

19

Maine at Boston College

18:00

SEP

26

Maine at Elon

18:00

SEP

29

UMA Lewiston Student Association Meeting

12:00 PM - Free

Announcements

View all
!

Maxwell Bridge Project Detour in Litchfield

Maxwell Bridge Project Detour in Litchfield | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Maxwell Bridge Project Detour in Litchfield 10/08/2025 LITCHFIELD – The Maine Department of Transportation will be performing work on the Maxwell Bridge over Maggoty Meadow Brook for up to thirty days to replace the precast concrete box culvert starting on October 8. The work is expected to be completed by November 4. Richmond Road (Route 197) will be open to local traffic. Upper Pond Road will be closed to through traffic. Message boards will be used to alert drivers of the detour and closure. Drivers should follow posted detour signs. The contractor on this project is Shaw Brothers Construction, Inc. of Gorham, Maine. The contract amount is $826,611.

!

Overnight Ramp Closures in Brunswick

Overnight Ramp Closures in Brunswick | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Overnight Ramp Closures in Brunswick 10/08/2025 BRUNSWICK – The Maine Department of Transportation will be closing three ramps in Brunswick overnight on October 8, 2025, from 9:00 PM to 6:00 AM. The southbound off ramp to Cooks Corner, the southbound off ramp to Route 196 West, and the northbound on ramp to Route 1 North from Cooks Corner will be closed for maintenance. Closures will be clearly marked with signs and cones. The closure will last for one night. Drivers traveling southbound on Route 1 from Bath to Cooks Corner will use the New Meadow Road Exit and connect to Bath Road to reach Cooks Corner or remain on Route 1 and exit on Ramp B (Main Street) and use Main Street to Mason St, to the Route 1 North on ramp and use the Cooks Corner exit. Drivers traveling southbound to Route 196 West will continue South on Route 1 to Ramp B (Main St). From there, drivers should take Maine Street to Mason St, To the Route 1 North on ramp and use Ramp C to Route 196 West. Drivers traveling from Cooks Corner to Route 1 North should use Bath Road to New Meadows Road to Route 1 North. These closures are part of an ongoing highway rehabilitation project. The project covers an area that begins 0.17 miles east of Cushing Street and extends east for 3.02 miles, as well as 0.70 miles west of Old Bath Road and extending west for 3.39 miles. All local approaches and ramps are included in this work, which consists of pavement milling, hot mix asphalt overlay, and safety improvements. The contractor on this project is Coastal Road Repair of Westbrook, Maine. The contract amount is $15,544,396.25.

!

Nightwork on I-295 over Route 1

Nightwork on I-295 over Route 1 | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Nightwork on I-295 over Route 1 10/08/2025 YARMOUTH – The Maine Department of Transportation will be reducing both northbound and southbound traffic on I-295 to a single lane between 8:00 PM and 6:00 AM, beginning Sunday, October 12, at 8:00 PM. The lane reduction is necessary to install rumble strips along the highway. The nightwork may be conducted a second evening if necessary. MaineDOT will provide updates on the project as needed. The contractor on this project is CPM Constructors. The contract amount is $27,566,209.72.

Advertisement

Advertisement

Advertisement

Advertisement