Skip to main content
Day.News — Local News. Real Community.
LEWISTON DAY NEWS
Local News. Real Community.

National

06/11/2026 · Lewiston

Full Edition

Shooting at San Diego Mosque Leaves Three Dead

A shooting at the Islamic Center of San Diego resulted in three fatalities. Two suspected teenage gunmen were later discovered dead in a vehicle, according to authorities.

06/11/2026
Read Story
Crime

Shooting at San Diego Mosque Leaves Five Dead

A shooting at the Islamic Center of San Diego on May 18, 2026, resulted in five deaths, including two teenage gunmen. Authorities are investigating the incident, which occurred at the largest mosque in San Diego.

06/11/2026

Politics

United States Removes Highly Enriched Uranium from Venezuela

The United States, in collaboration with Venezuela and the United Kingdom, has completed the removal of highly enriched uranium from Venezuela's RV-1 research reactor. The International Atomic Energy Agency provided technical support. The operation finished more than two years ahead of the initial schedule.

06/11/2026

Local News

Trump and Xi Agree to Trade and Investment Board After Beijing Meeting

President Donald Trump concluded a meeting with Chinese President Xi Jinping in Beijing with an agreement to establish a board focused on trade and investment. The leaders characterized the talks as productive, but specifics of future policy remain unclear. Trump has returned to Washington following the summit.

06/11/2026

Local News

Trump Faces Inflation Concerns Upon Return From China

President Donald Trump has returned from a state visit to China as economic pressures mount at home. The annual U.S. inflation rate reached 3.8% in April.

06/11/2026

Politics

Trump Visits Beijing Amid Primary Season and Iran Tensions

President Trump recently concluded a visit to Beijing, even as political attention shifts towards upcoming primary elections. Simultaneously, international concerns linger regarding tensions with Iran.

06/11/2026

Advertisement

Advertisement

Upcoming Events

View all

SEP

19

Maine at Boston College

18:00

SEP

26

Maine at Elon

18:00

SEP

29

UMA Lewiston Student Association Meeting

12:00 PM - Free

Announcements

View all
!

Maxwell Bridge Project Detour in Litchfield

Maxwell Bridge Project Detour in Litchfield | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Maxwell Bridge Project Detour in Litchfield 10/08/2025 LITCHFIELD – The Maine Department of Transportation will be performing work on the Maxwell Bridge over Maggoty Meadow Brook for up to thirty days to replace the precast concrete box culvert starting on October 8. The work is expected to be completed by November 4. Richmond Road (Route 197) will be open to local traffic. Upper Pond Road will be closed to through traffic. Message boards will be used to alert drivers of the detour and closure. Drivers should follow posted detour signs. The contractor on this project is Shaw Brothers Construction, Inc. of Gorham, Maine. The contract amount is $826,611.

!

Overnight Ramp Closures in Brunswick

Overnight Ramp Closures in Brunswick | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Overnight Ramp Closures in Brunswick 10/08/2025 BRUNSWICK – The Maine Department of Transportation will be closing three ramps in Brunswick overnight on October 8, 2025, from 9:00 PM to 6:00 AM. The southbound off ramp to Cooks Corner, the southbound off ramp to Route 196 West, and the northbound on ramp to Route 1 North from Cooks Corner will be closed for maintenance. Closures will be clearly marked with signs and cones. The closure will last for one night. Drivers traveling southbound on Route 1 from Bath to Cooks Corner will use the New Meadow Road Exit and connect to Bath Road to reach Cooks Corner or remain on Route 1 and exit on Ramp B (Main Street) and use Main Street to Mason St, to the Route 1 North on ramp and use the Cooks Corner exit. Drivers traveling southbound to Route 196 West will continue South on Route 1 to Ramp B (Main St). From there, drivers should take Maine Street to Mason St, To the Route 1 North on ramp and use Ramp C to Route 196 West. Drivers traveling from Cooks Corner to Route 1 North should use Bath Road to New Meadows Road to Route 1 North. These closures are part of an ongoing highway rehabilitation project. The project covers an area that begins 0.17 miles east of Cushing Street and extends east for 3.02 miles, as well as 0.70 miles west of Old Bath Road and extending west for 3.39 miles. All local approaches and ramps are included in this work, which consists of pavement milling, hot mix asphalt overlay, and safety improvements. The contractor on this project is Coastal Road Repair of Westbrook, Maine. The contract amount is $15,544,396.25.

!

Nightwork on I-295 over Route 1

Nightwork on I-295 over Route 1 | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Nightwork on I-295 over Route 1 10/08/2025 YARMOUTH – The Maine Department of Transportation will be reducing both northbound and southbound traffic on I-295 to a single lane between 8:00 PM and 6:00 AM, beginning Sunday, October 12, at 8:00 PM. The lane reduction is necessary to install rumble strips along the highway. The nightwork may be conducted a second evening if necessary. MaineDOT will provide updates on the project as needed. The contractor on this project is CPM Constructors. The contract amount is $27,566,209.72.

Advertisement

Advertisement

Advertisement

Advertisement