Daily Fun
06/08/2026 · Lewiston
The Affirmation That Actually Works (And Why You've Been Saying Them Wrong)
Most affirmations fail because they ask you to believe something you don't. Here's the one shift that changes everything.
Why Rereading the Same Poem Changes Everything (And How to Do It Right)
That poem you read in high school? You didn't actually read it. Here's why your second read—or your fifth—is the one that matters.
06/08/2026
The Art of the Productive Digression: Why Distraction Might Be Your Best Thinking Tool
Everyone tells you to focus. But some of history's greatest minds discovered that the best ideas arrive when you're supposed to be doing something else entirely.
06/08/2026
The Fed Just Admitted It's Been Flying Blind, and Your Mortgage Pays the Price
Janet Yellen's successor confessed the Fed massively misjudged inflation. Here's what that means for your wallet before the end of the year.
06/08/2026
The Met's Maximalist Takeover Proves Clutter Is a Love Language
Museums are finally admitting what hoarders have known all along: sometimes more is exactly right, and empty walls are a betrayal of human joy.
06/08/2026
The Awkward Truth About Second Chances (And Why They Actually Work)
A hospice nurse who spent years angry at her estranged father decided to call him. What she learned surprised everyone, including herself.
06/08/2026
Advertisement
Upcoming Events
View allSEP
19
Maine at Boston College
18:00
SEP
26
Maine at Elon
18:00
SEP
29
UMA Lewiston Student Association Meeting
12:00 PM - Free
Announcements
View allMaxwell Bridge Project Detour in Litchfield
Maxwell Bridge Project Detour in Litchfield | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Maxwell Bridge Project Detour in Litchfield 10/08/2025 LITCHFIELD – The Maine Department of Transportation will be performing work on the Maxwell Bridge over Maggoty Meadow Brook for up to thirty days to replace the precast concrete box culvert starting on October 8. The work is expected to be completed by November 4. Richmond Road (Route 197) will be open to local traffic. Upper Pond Road will be closed to through traffic. Message boards will be used to alert drivers of the detour and closure. Drivers should follow posted detour signs. The contractor on this project is Shaw Brothers Construction, Inc. of Gorham, Maine. The contract amount is $826,611.
Overnight Ramp Closures in Brunswick
Overnight Ramp Closures in Brunswick | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Overnight Ramp Closures in Brunswick 10/08/2025 BRUNSWICK – The Maine Department of Transportation will be closing three ramps in Brunswick overnight on October 8, 2025, from 9:00 PM to 6:00 AM. The southbound off ramp to Cooks Corner, the southbound off ramp to Route 196 West, and the northbound on ramp to Route 1 North from Cooks Corner will be closed for maintenance. Closures will be clearly marked with signs and cones. The closure will last for one night. Drivers traveling southbound on Route 1 from Bath to Cooks Corner will use the New Meadow Road Exit and connect to Bath Road to reach Cooks Corner or remain on Route 1 and exit on Ramp B (Main Street) and use Main Street to Mason St, to the Route 1 North on ramp and use the Cooks Corner exit. Drivers traveling southbound to Route 196 West will continue South on Route 1 to Ramp B (Main St). From there, drivers should take Maine Street to Mason St, To the Route 1 North on ramp and use Ramp C to Route 196 West. Drivers traveling from Cooks Corner to Route 1 North should use Bath Road to New Meadows Road to Route 1 North. These closures are part of an ongoing highway rehabilitation project. The project covers an area that begins 0.17 miles east of Cushing Street and extends east for 3.02 miles, as well as 0.70 miles west of Old Bath Road and extending west for 3.39 miles. All local approaches and ramps are included in this work, which consists of pavement milling, hot mix asphalt overlay, and safety improvements. The contractor on this project is Coastal Road Repair of Westbrook, Maine. The contract amount is $15,544,396.25.
Nightwork on I-295 over Route 1
Nightwork on I-295 over Route 1 | Maine Department of Transportation Home Skip to top navigation Skip to side navigation Skip to content Skip to footer Nightwork on I-295 over Route 1 10/08/2025 YARMOUTH – The Maine Department of Transportation will be reducing both northbound and southbound traffic on I-295 to a single lane between 8:00 PM and 6:00 AM, beginning Sunday, October 12, at 8:00 PM. The lane reduction is necessary to install rumble strips along the highway. The nightwork may be conducted a second evening if necessary. MaineDOT will provide updates on the project as needed. The contractor on this project is CPM Constructors. The contract amount is $27,566,209.72.
Advertisement
Advertisement
