Day.News — Local News. Real Community.
JAY DAY NEWS
Local News. Real Community.
general

Fountain Community Complex

HA
Harvey WaldenCommunity Member
3 hours ago

Fountain Community Complex | Bay County, FL

Fountain Community Complex | Bay County, FL Project Overview:Bay County was awarded Nine Million One Hundred Eighty-One Thousand Three Hundred and Eleven Dollars ($9,181,311.00) in CDBG-DR funds for the Fountain Community Complex Project. The project will be leveraged with Three Million Dollars ($3,000,000.00) that the County will contribute to the construction of this project. In total, the cost of the Fountain Community Complex will be Twelve Million, One Hundred and Eighty-One Thousand and Three Hundred and Eleven Dollars. ($12,181,311.00). This project will replace the condemned East Hiland Fire Station as the area’s primary emergency shelter. The Fountain Complex is to be used as a hardened shelter for residents, deputies, and strike teams during disaster events. Post-storm, this complex will be used for disaster recovery missions for the residents of Fountain serving as a Long-Term Shelter (if needed), a Business Recovery and Disaster Recovery Center, a Point of Distribution (POD) Site, and a disaster staging site for utility crews in the northern part of the county. The County plans on constructing a 180’ x 50’ prefab metal hardened building to house the Community/Recreational Center and Sheriff Sub-Station. The Center will house basketball courts, a walking track, and other amenities, meet 150 mph wind loads and meet all local, state, and federal building codes.   The fire station will be a 10,000 square foot brick and mortar facility housing up to eight personnel, an engine, tanker, brush truck and EMS vehicle.  Restoration of Infrastructure Damaged by Hurricane Michael A.  Construction will be completed by Bay County Public Works staff, a construction contractor, and a construction inspection and engineering consultant.  The construction contractor and construction inspection and engineering consultant will be procured through a competitive bidding process overseen by the Bay County Department of Public Works. B.   This project will meet the low- and moderate-income National Objective in that 59.97% (Census Block Data) of the residents within the unincorporated townships of Youngstown and Fountain of Bay County are of low and moderate-income.    a. Total Beneficiaries: 3,735    b.  LMI Beneficiaries:   2,240 Project construction does not fall within a FEMA flood zone. Project Timeline: Engineer Design Phase 1                                                                       100% CompletePhase II Construction Construction  Begins                                                                               December 2025 Procurement Link: 23-13

Spread the word

Comments (0)

Log in to join the conversation.

No comments yet. Be the first to share your thoughts.

Community Guidelines
  • Share local celebrations and life transitions.
  • Maintain a respectful and supportive tone.
  • Verify event details before posting.
  • No commercial advertising in announcements.
Upcoming Local Events
Oct06

Preschool Storytime (Jay)

Jay Library
Oct08

Toddler Time (Jay)

Jay Library
Oct08

Game-O-Rama (Jay)

Jay Library
Oct13

Preschool Storytime (Jay)

Jay Library
Oct14

Homeschool Hangout (Jay)

Jay Library

Celebrate Together

Sharing announcements helps build a stronger, more connected community.

Post Yours

Have a milestone to share with your community? Let everyone know.

Create Announcement