Skip to main content
Day.News — Local News. Real Community.
FLORIDA DAY NEWS
Local News. Real Community.
Panama City moves forward with Cedar Grove wastewater system upgrade
local_news
1 min read

Panama City Advances Cedar Grove Wastewater System Upgrade with Federal Grant Funding

Panama City is advancing plans to upgrade the wastewater collection system in its Cedar Grove Subdistrict to enhance resilience and capacity. The project is funded through the Hazard Mitigation Grant Program (HMGP) DR-4399-111-R.

10/02/2026 · Florida edition

Advertisement

Advertisement

Panama City is advancing plans to upgrade the wastewater collection system in its Cedar Grove Subdistrict, a project aimed at enhancing resilience and capacity. The initiative, funded through the Hazard Mitigation Grant Program (HMGP) DR-4399-111-R, focuses on protecting critical infrastructure within the 32405 zip code area.

The initial phase, known as Phase I, involved surveying, engineering, design, plans preparation, permitting, and bidding. This crucial groundwork laid the foundation for future improvements, though no construction activities have yet received approval. The project's primary goal is to provide protective measures for the wastewater system, particularly in an area identified by coordinates (30.176714, -85.627544).

Phase II outlines significant infrastructure enhancements, including the construction of an adjunct sewage lift station and force main. This new infrastructure will reduce the flow demand on the existing BC-29 lift station and increase the overall capacity of the system. The new lift station will be located at the Southeast corner of Spring Avenue Park and will feature a wet well, valve box, two electric submersible pumps, associated piping, a control panel, and electrical connections.

A key component of the new lift station is a permanent diesel-powered bypass pump, designed to ensure continuous operation during power outages. This bypass pump will have a capacity of 400 to 500 gallons per minute (GPM). The installation also includes a platform to raise the bypass pump and electrical equipment, providing enhanced protection against potential hazards. The city will provide deliverables for Phase II review once the initial planning stages are complete.

Related Topics

Editorial Transparency
AI-Generated · Written by Claire Donovan

Article Ratings

Factual
0.0
Likeable
0.0
Bias
0.0
Objective
0.0

How do you feel about this story?

CL

Claire Donovan

Trust 3.6228 articles0 views94% fact accuracy
View Profile

Sign in to follow this author from their profile.

Discussion (0)

Join the Conversation

Join the conversation

Sign in to share your thoughts, reply to readers, and like comments.

Sign in to comment
Sort by:
0 comments

No comments yet. Be the first to comment!

Trending Now

Trending stories will appear here.

More from Florida

No other local stories are available right now.

Events & Things to Do

Read section →

Upcoming events will appear here.

Advertisement

Advertisement

Keep Reading

Related Stories

More local news stories from Florida

local news

Bay County secures Majette Fuel Island with FEMA grant

Bay County secured a FEMA grant to install an emergency generator at the Majette Yard Fuel Island, ensuring critical fuel services for emergency vehicles during outages.

Read Story →
local news

Inverness City Manager Eric Williams marks a decade of service

Inverness City Manager Eric Williams celebrates over a decade of service, leading the city since January 2020 with a focus on development and community.

Read Story →
local news

Deerfield Beach joins national 'Love Your Block' initiative for community revitalization

Deerfield Beach joins the national 'Love Your Block' initiative, receiving $70,000 and expert support for resident-led community improvement projects.

Read Story →
local news

Martin County residents: How to pay your traffic ticket

Martin County residents can find clear guidance on how to pay traffic citations, including online, in-person, and phone options, along with important deadlines and processing times.

Read Story →
local news

Rockledge Building Division Enhances Services with New Permitting Software and Code Updates

Rockledge's Building Division implemented new SmartGOV software for permits and adopted the Florida Building Code 8th Edition 2023, streamlining services for residents.

Read Story →
local news

Bay County plans new FEMA-compliant safe room at jail site

Bay County is planning a new FEMA-compliant safe room at the Bay County Jail to protect first responders and serve as a critical operational hub.

Read Story →
Scroll for more stories